Metal Decking For Concrete | Steel Floor Decking

Composite metal floor decking
Solid composite decking
Backgroud Pattern
  • E-mail : marketing@solidecking.com
  • Phone : +86 13816755915
  • Address : Shanghai China

Hoisting and stacking of steel deck

(1) The floor of the steel deck stacking area shall be basically flat, and the steel deck stacking shall not be too high. It is appropriate that each stack shall not exceed 40 sheets. Sling can be used for vertical transportation of steel deck.
(2) When the steel deck is transported to the site, it shall be properly protected from any damage and pollution, especially oil pollution. When the steel deck is temporarily stacked on the steel beam, it shall be dispersed to avoid concentrated load.
(3) Before hoisting, check whether the steel deck bundle number and hoisting position are accurate and whether the packaging is stable.
(4) Trial hoisting shall be carried out before hoisting to check whether the center of gravity is stable and whether the steel cable will slide. Hoisting can be carried out only after the safety inspection is completed.
(5) The steel deck shall be hoisted with special slings to prevent slipping. When lifting, each bundle shall have two lifting belts, which shall be tied at about one quarter of both ends.
(6) The principle of lifting materials from the bottom to the upper floor is adopted to avoid hindering the lifting operation of the next floor after lifting the upper materials first.

  • date

    2022-09-13

  • location

    Shanghai, China