Home >> Project
In 2015, SOLIDECK cooperated with China Construction Eighth Engineering Bureau to become the steel deck supplier for the X-1 project of Shanghai International Aviation Service Center, providing nearly 60,000 square meters of SD66-720 steel deck for the project, and providing the detailed drawing des
Send InquiryMaldives Velana International Airport VIP Terminal Project is located in Maldives Airport Island. It is a special terminal for Maldives to receive foreign heads of state and high-end business travelers. SOLIDECK provides our company's SD65-510 and SD75-600 two deck types, with an area of about 5
Send InquiryIn January 2021, SOLIDECK was selected for the Macau Airport South Extension Project. The project selected SD51-750 steel deck with a thickness of 1.0mm and a construction period of 1 month. SOLIDECK completed the task perfectly.
Send InquirySOLIDECK undertook the technical, production and transportation work of the floor deck. The technical aspects include the preliminary planning and design of the floor deck, the mid-term layout design, and the later on-site floor deck installation consultation and technical work; during the processin
Send InquirySolideck began to supply the steel deck of Shanghai Jita semiconductor project on April 20, 2019 and completed the supply on May 19, 2019. It took more than one month to process and complete the 25000 square steel deck, which was highly praised by the owner and customers
Send InquirySince 2017, SOLIDECK has begun to undertake the supply of envelope structures for the first phase of HO and DP projects of Karachi Nuclear Power Plant in Pakistan, including color steel roof panels, color steel wall panels and accessories
Send InquiryIn the PR25/PR26 export project of Morison, Morison Group took great pains to select the steel deck manufacturer, because the owner required to issue a steel deck calculation book in accordance with the American standard, and required to carry out the steel deck detailing design according to the Ame
Send InquiryThe construction project of the air corridor of Avenida Kimaras, Taipa, Macau. The project site is located at Avenida Kimaras, Taipa, Macau and its vicinity. It is a double-layer steel structure bridge, which is an important pedestrian system for departures.
Send InquiryRecently, solideck undertook the supply of steel deck and related technical services of Ningbo City Exhibition Hall.The new urban exhibition hall is located in the new city in the east of Ningbo, with an overall building scale of 25000m2 and a total of five floors.
Send InquiryIn 2013, our company (Shanghai Leshang Building Materials Co., Ltd.) and Shanghai Si'an Company signed a floor deck contract for Shanghai Power Station of Art to supply floor deck and related technical services for the Shanghai Power Station of Art project.
Send InquiryIn 2009, SOLIDECK signed a contract for the supply of steel decks for the US Pavilion of the World Expo, with a contracted area of about 7,000 square meters and deck type of SD66-720 steel deck, and undertook the deepening of steel decks for the US Pavilion.
Send InquiryIn 2017, SOLIDECK cooperated with Shanghai Construction Group(SCG) to become the steel deck supplier of Hong Kong-Zhuhai-Macau Bridge Frontier Port. This project adopts SD65-555, with an area of about 60,000 square meters. We performed very well throughout the process, mainly in
Send InquiryIn 2008, our company (Shanghai Leshang Building Materials Co., Ltd.) participated in the construction of Shanghai World Financial Center project, not only provided customers with the required steel structure building materials, but also provided customers with more detailed profiled steel plate desi
Send InquiryBeijing leeza SOHO is a project designed by the famous architect Zaha Hadid, with a total height of 200 meters, 48 floors and an area of 172800 m2. The Leeza Soho project feature the world’s tallest atrium – a 200m-high space which extends the full height of the ‘gently twisting’ cylindrical tower.
Send InquiryThe Bank of China building is located in the CBD of the core area of Ningbo Eastern New Town, with a total building height of 246m; The total construction area is about 145000 square meters, with 49 floors in total.
Send InquiryIn 2012, Solideck signed the steel deck supply contract for the headquarters building of Bank of Jiangsu. The steel deck area is about 50000 square meters. The steel deck plate type is closed profiled steel plate sd46-600, 0.75mm and 1.0mm. Solideck undertakes the deepening of the steel deck. The su
Send InquiryChangsha international financial center is the tallest building in Hunan and a new landmark of Changsha. The main tower T1 has 94 floors and a height of 452 meters.
Send Inquiry